Lưu ý thành viên Telegram


QUAN TRỌNG !!!


1. Tất cả thành viên tham gia phải đúng tên và đầy đủ tên thật khi tham gia nhóm.
2. Thành viên vị phạm sẽ bị loại mà không thông báo trước.
3. Những thành viên bị loại, vui lòng xóa tài khoản và tạo tài khoản mới để tham gia lại.
4. Thành viên loại, Admin không hỗ trợ quay lại nhóm.
5. Link tham gia: https://t.me/+dUB42hQsIn5iMGFl .

Thân
Biên ND 
Telegram user: @biennd

Standard for Welding Inspector / Welding Engineer



WB-001  - EN 1090 & ISO 3834  -  Code Books

BS EN 1090-1 - 2009+A1-2011

BS EN 1090-2 2018

ISO 3834-1-2021

ISO 3834-2-2021

ISO 3834-3-2021

ISO 3834-4-2021

ISO 3834-5-2021


WB-002 - EWF/IIW Diploma – Design and Construction / EWF/IIW Diploma – Fabrication and Application

TWI - IWE DAC2 course notes

TWI - IWE FAA2 Course Notes

TWI - IWE MAB2 course notes

TWI - IWE WPE2 course notes


WB-006 ~ WB-009 - IWE 2018

IWE 2018 – Module 1

IWE 2018 – Module 2

IWE 2018 – Module 3

IWE 2018 – Module 4


WB-010 EN-ISO Welding Procedure  -  Code Books

ISO 15607 2019

ISO 15608 2013

ISO 15609-1 2019

ISO 15610 2003

ISO 15611 2019

ISO 15612 2018

ISO 15613 2004

ISO 15614-1 2017

EN 1011-2_2001

EN 1011-3 2003

ISO 2553 2019

ISO 4063 - 2009

ISO 6947 2011

ISO 14175 2014

ISO TR 17671-1-2

ISO 17659 2005

ISO-9692-1 2013

ISO-9692-2 1998

ISO-9692-3 2002

ISO 9606-1 2017

ISO 14732 2013


WB-011 - EN-ISO Inspection  -  Code Books

ISO 9712 2014+A1

ISO 17637-2016

ISO 148-1 2016

ISO 4136 2012

ISO 5173 2009

ISO 5817 2023

ISO 6520-1 2007

ISO 9015 2011

ISO 9017 (2017)

ISO 13920-2023

ISO 17636-1 2013

ISO 17636-2 2022

ISO 17639

ISO 17640 2018


WB-013 - EN-ISO Reference  -  Code Books

ISO 636 2017

ISO 2560 2009

ISO 14171 2010

ISO 14341

ISO 14343-2009

ISO 17632 2006

ISO 17633 2006

ISO 20173 2009

ISO TR 18491-2015



Preheat calculation



 [1] Heat Input - Welding process denoted number 111, 121, 126, … according to BS EN ISO 4063:2010 shall be applied k-factor (EN 1011-1). AWS/ASME - welding processes will multiple constant k-factor (k=1).
[2] Preheat - Preheat determination based on base material CET and according to Annex C of EN 1011-2:2001 (See C.3.2.1).
[3] Cooling time t8/5 - calculation of cooling time t800/500 according to Annex D of EN 1011-2:2001 (See D.6).
[4] Input your data into the YELOW cell.

--> Download free at here.



Other template and format for CET, HD and thickness: 







QW-405.2 welding positions - ASME IX 2019

 In ASME IX 2019 deleted supplementary essential variables “QW-405.2 welding positions” which given SMAW, FCAW, GMAW, PAW.

See SUMMARY OF CHANGES in this code book.

A qualification in any position qualifies the procedure for all positions
Also see QW-203.

A qualified in pipe also qualify for plate and vice versa. You may combine these WPSs in new procedure, also see QW-200.4

FCAW electrode desgination - ISO 17632

 

Source: SFI/IWE 1.08:2018 - Table 3

11 steps to prepare a hydrotest package



🧪 Hydrostatic Test Package Preparation Guide

Inspection Point in ITP – QA/QC Controlled Document


🔧 General Requirements

Hydrostatic testing is an essential inspection activity listed in the Inspection and Test Plan (ITP). Before performing a hydrotest, the following conditions must be fulfilled:

  • The hydrotest procedure has been approved by the client and/or consultant.

  • All welding activities within the test boundary must be completed and inspected by all parties.

  • Non-Destructive Testing (NDT) must be performed according to the project specification, with acceptable results.

  • All relevant documentation must be collected for inclusion in the test package.


📦 11 Steps to Prepare a Hydrotest Package

1. Cover Page

  • Include project name, client, contractor, system name, line class, and test type.

  • A sample form can be customized to suit your project format.


2. Content Sheet

  • Provides a summary index of documents included.

  • Pre-fill standard information (e.g., project name, test type) in templates to save time.

  • Forms may be typed or handwritten at the site, depending on project practice.


3. Pre-Test Checklist

  • Conduct this jointly with the client before pressurization.

  • Items include valve positions, flange bolt checks, blinds installed, supports in place, etc.


4. Line List

  • Include spool numbers, line numbers, service description, test pressure, and length.

  • Inspector must check and sign each spool on the drawing.

  • Use only approved drawings to prepare the test list.


5. Line Check

  • Verify all piping spools are installed per the approved drawings.

  • Mark or highlight test spools on isometric drawings and P&IDs.

  • Confirm valve direction, check valve orientation, and isolate components not to be tested.

  • Submit flagged drawings for client verification and signature.


6. Welding Data

  • Include welding summary logs (WPS/PQR/WPQ) and NDT reports (RT, MT, PT, etc.).

  • All visual and dimensional inspections should be satisfactory before pressure testing.


7. Material Traceability

  • Ensure all materials and spools are traceable.

  • Maintain MTCs and spool traceability records as part of the QA requirement.


8. Pressure Test Certificate

  • Record actual test pressure, date/time, duration, and hold period.

  • Use calibrated pressure gauges (within 6 months).

  • Install two gauges: one at the highest point and one at a visible point for monitoring.

  • Gauge range must be 1.5 to 4.0 times the test pressure per applicable code.


9. Pressure Chart Recorder (if required)

  • Attach the pressure chart to the package for test record verification.

  • Record should reflect start/hold/end time and pressure trend.


10. Temperature Record (Optional)

  • Record ambient temperature or water temperature during testing.

  • Useful for justifying pressure drops due to temperature changes.


11. Punch List

  • Include any outstanding work or comments found during pre-test or testing.

  • If no issues are found, create a "no comment" punch list endorsed by the client.


📤 Test Package Submission

Submit the complete hydrotest dossier to the client or third party for review and approval. The typical contents include:

  • ✅ Cover page

  • ✅ Hydrotest instruction or method statement

  • ✅ Pre-test checklist / Line check record

  • ✅ Line list

  • ✅ Marked P&ID and Isometric drawings (highlight test area)

  • ✅ Material traceability records

  • ✅ Welding summary and NDT reports

  • ✅ Pressure test certificate

  • ✅ Calibration certificates (pressure gauge, chart recorder, thermometer, etc.)

  • ✅ Photos of gauge reading at start/end of test (if required)

  • ✅ Final punch list (with or without comments)

💡 All documents should be scanned and compiled into a single PDF file for submission.



ASM Handbook Set



ASM Handbook Set (33 Volumes + Index) 

  

Volume 1: Properties and Selection: Irons, Steels, and High-Performance Alloys 

Volume 2: Properties and Selection: Nonferrous Alloys and Special-Purpose Materials 

Volume 3: Alloy Phase Diagrams 

Volume 4: Heat Treating 

Volume 4A: Steel Heat Treating Fundamentals and Processes 

Volume 4B: Heat Treating Technologies (shipping October 2014) 

Volume 4C: Induction Heating and Heat Treating 

Volume 4D: Heat Treating Irons & Steels (shipping October 2014) 

Volume 5: Surface Engineering 

Volume 5A: Thermal Spray Technology 

Volume 6: Welding, Brazing and Soldering 

Volume 6A: Welding Fundamentals and Processes 

Volume 7: Powder Metal Technologies and Applications 

Volume 8: Mechanical Testing and Evaluation 

Volume 9: Metallography and Microstructures 

Volume 10: Materials Characterization 

Volume 11: Failure Analysis and Prevention 

Volume 12: Fractography 

Volume 13A: Corrosion: Fundamentals, Testing, and Protection 

Volume 13B: Corrosion: Materials 

Volume 13C: Corrosion: Environments and Industries 

Volume 14A: Metalworking: Bulk Forming 

Volume 14B: Metalworking: Sheet Forming 

Volume 15: Casting 

Volume 16: Machining 

Volume 17: Nondestructive Evaluation and Quality Control 

Volume 18: Friction, Lubrication, and Wear Technology 

Volume 19: Fatigue and Fracture 

Volume 20: Materials Selection and Design 

Volume 21: Composites 

Volume 22A: Fundamentals of Modeling for Metals Processing 

Volume 22B: Metals Process Simulation 

Volume 23: Materials for Medical Devices 

Comprehensive Index to ASM Handbooks, Third Edition 

 

Format: Hardbound, 33 Volume Set + Index 

 

Publisher: ASM International 

Published: 2014


Order at https://www.asminternational.org/books-handbooks/ 

Featured Post

Giám sát hàn

(Hình ảnh chụp tại nhà máy CNI - Nhơn Trạch) I. NÊN HỌC CSWIP KHÔNG? BẮT ĐẦU TỪ ĐÂU? Khi bắt đầu tìm hiểu về chứng chỉ CSWIP (Certification ...