QW-405.2 welding positions - ASME IX 2019

  In ASME IX 2019 deleted supplementary essential variables “QW-405.2 welding positions” which given SMAW, FCAW, GMAW, PAW. See SUMMARY OF CHANGES in this code book. A qualification in any position qualifies the procedure for all positions Also see QW-203. A qualified in pipe also qualify for plate and vice versa. You may combine these WPSs in new procedure, also see QW-200.4

FCAW electrode desgination - ISO 17632

  Source: SFI/IWE 1.08:2018 - Table 3

11 steps to prepare a hydrotest package

🧪 Hydrostatic Test Package Preparation Guide Inspection Point in ITP – QA/QC Controlled Document 🔧 General Requirements Hydrostatic testing is an essential inspection activity listed in the Inspection and Test Plan (ITP) . Before performing a hydrotest, the following conditions must be fulfilled : The hydrotest procedure has been approved by the client and/or consultant. All welding activities within the test boundary must be completed and inspected by all parties. Non-Destructive Testing (NDT) must be performed according to the project specification, with acceptable results . All relevant documentation must be collected for inclusion in the test package . 📦 11 Steps to Prepare a Hydrotest Package 1. Cover Page Include project name, client, contractor, system name, line class, and test type. A sample form can be customized to suit your project format. 2. Content Sheet Provides a summary index of documents included. Pre-fill standard informatio...