Source: SFI/IWE 1.08:2018 - Table 3
11 steps to prepare a hydrotest package
🧪 Hydrostatic Test Package Preparation Guide
Inspection Point in ITP – QA/QC Controlled Document
🔧 General Requirements
Hydrostatic testing is an essential inspection activity listed in the Inspection and Test Plan (ITP). Before performing a hydrotest, the following conditions must be fulfilled:
-
The hydrotest procedure has been approved by the client and/or consultant.
-
All welding activities within the test boundary must be completed and inspected by all parties.
-
Non-Destructive Testing (NDT) must be performed according to the project specification, with acceptable results.
-
All relevant documentation must be collected for inclusion in the test package.
📦 11 Steps to Prepare a Hydrotest Package
1. Cover Page
-
Include project name, client, contractor, system name, line class, and test type.
-
A sample form can be customized to suit your project format.
2. Content Sheet
-
Provides a summary index of documents included.
-
Pre-fill standard information (e.g., project name, test type) in templates to save time.
-
Forms may be typed or handwritten at the site, depending on project practice.
3. Pre-Test Checklist
-
Conduct this jointly with the client before pressurization.
-
Items include valve positions, flange bolt checks, blinds installed, supports in place, etc.
4. Line List
-
Include spool numbers, line numbers, service description, test pressure, and length.
-
Inspector must check and sign each spool on the drawing.
-
Use only approved drawings to prepare the test list.
5. Line Check
-
Verify all piping spools are installed per the approved drawings.
-
Mark or highlight test spools on isometric drawings and P&IDs.
-
Confirm valve direction, check valve orientation, and isolate components not to be tested.
-
Submit flagged drawings for client verification and signature.
6. Welding Data
-
Include welding summary logs (WPS/PQR/WPQ) and NDT reports (RT, MT, PT, etc.).
-
All visual and dimensional inspections should be satisfactory before pressure testing.
7. Material Traceability
-
Ensure all materials and spools are traceable.
-
Maintain MTCs and spool traceability records as part of the QA requirement.
8. Pressure Test Certificate
-
Record actual test pressure, date/time, duration, and hold period.
-
Use calibrated pressure gauges (within 6 months).
-
Install two gauges: one at the highest point and one at a visible point for monitoring.
-
Gauge range must be 1.5 to 4.0 times the test pressure per applicable code.
9. Pressure Chart Recorder (if required)
-
Attach the pressure chart to the package for test record verification.
-
Record should reflect start/hold/end time and pressure trend.
10. Temperature Record (Optional)
-
Record ambient temperature or water temperature during testing.
-
Useful for justifying pressure drops due to temperature changes.
11. Punch List
-
Include any outstanding work or comments found during pre-test or testing.
-
If no issues are found, create a "no comment" punch list endorsed by the client.
📤 Test Package Submission
Submit the complete hydrotest dossier to the client or third party for review and approval. The typical contents include:
-
✅ Cover page
-
✅ Hydrotest instruction or method statement
-
✅ Pre-test checklist / Line check record
-
✅ Line list
-
✅ Marked P&ID and Isometric drawings (highlight test area)
-
✅ Material traceability records
-
✅ Welding summary and NDT reports
-
✅ Pressure test certificate
-
✅ Calibration certificates (pressure gauge, chart recorder, thermometer, etc.)
-
✅ Photos of gauge reading at start/end of test (if required)
-
✅ Final punch list (with or without comments)
💡 All documents should be scanned and compiled into a single PDF file for submission.
ASM Handbook Set
ASM Handbook Set (33 Volumes + Index)
Volume 1: Properties and Selection: Irons, Steels, and High-Performance Alloys
Volume 2: Properties and Selection: Nonferrous Alloys and Special-Purpose Materials
Volume 3: Alloy Phase Diagrams
Volume 4: Heat Treating
Volume 4A: Steel Heat Treating Fundamentals and Processes
Volume 4B: Heat Treating Technologies (shipping October 2014)
Volume 4C: Induction Heating and Heat Treating
Volume 4D: Heat Treating Irons & Steels (shipping October 2014)
Volume 5: Surface Engineering
Volume 5A: Thermal Spray Technology
Volume 6: Welding, Brazing and Soldering
Volume 6A: Welding Fundamentals and Processes
Volume 7: Powder Metal Technologies and Applications
Volume 8: Mechanical Testing and Evaluation
Volume 9: Metallography and Microstructures
Volume 10: Materials Characterization
Volume 11: Failure Analysis and Prevention
Volume 12: Fractography
Volume 13A: Corrosion: Fundamentals, Testing, and Protection
Volume 13B: Corrosion: Materials
Volume 13C: Corrosion: Environments and Industries
Volume 14A: Metalworking: Bulk Forming
Volume 14B: Metalworking: Sheet Forming
Volume 15: Casting
Volume 16: Machining
Volume 17: Nondestructive Evaluation and Quality Control
Volume 18: Friction, Lubrication, and Wear Technology
Volume 19: Fatigue and Fracture
Volume 20: Materials Selection and Design
Volume 21: Composites
Volume 22A: Fundamentals of Modeling for Metals Processing
Volume 22B: Metals Process Simulation
Volume 23: Materials for Medical Devices
Comprehensive Index to ASM Handbooks, Third Edition
Format: Hardbound, 33 Volume Set + Index
Publisher: ASM International
Published: 2014
Skid fabrication - inspection documents for QC
Following the topic, we would like to share you the quality document for small skid.
Inspection check list
- Procedures and inspection should prepare and included in your hand, NDE procedure, NDE map, welding map and NDE plan also prepared.
- You should make a content of procedures for control, type of inspection report, below is sample list of procedure.
Document control
- Too many drawings/ document per each skid, so it should carefully update with latest revision,
- Line list should be updated and control the piping spool number, all spools to be identified in the test package later.
- Shop drawing, document submission to be documented revision number, date of submission, date of return, and approval code, etc.
Inspection report
- To control and monitor all inspection reports, the assigned coding number should generate before starting issue.
Welding summary
- For structural steel
- For piping
Material receiving inspection
- MRIR for piping, bolting, gasket, fitting
- MRIR for consumable
- MRIR for structural steel
- MRIR for electric & instrument
- Material traceability
Visual inspection
- For piping
- For structure
Dimensional inspection
- Base frame - structure.
- Piping spool, loose items.
- Tie-in point report.
NDE Reports
- MT/PT reports
- RT/UT reports
- Hardness test, ferrite test (if any)
Coating inspection report
- Blasting and painting inspection report
- Pickling and passivation report
- Holiday test, salt test, dust test, pull of test (if any)
Testing reportHydrotest & Pneumatic test
- See hydrotest & pneumatic test procedure, prepare the test package, and update the test package.
Factory acceptance test
- Tie-in point report.
- Bolt tightening report.
- Leak test for instrument air.
- Leak test for pipe system.
- Function test for valve, equipment.
Packing report
- Important do not miss during inspection: to check all the packing list, listed out all items installed or mounting on skids, spare part items, loose items, location of packing items, protection, preservation, etc.
- Record all packing and photos evident should be kept.
- To make sure all package had been checked and verified by all parties, and signed off in the packing list before moving next stage of the issue "IRN - Inspection Release Note".
Inspection release note
- The IRN will be issued by Client or their representative inspector will issue it because the inspection point is Hold Point.
- This is an evident document for payment and confirmation that had been inspection before shipping.
Final Manufacturer data book
- Collect all procedure, instruction used for fabrication and inspection record to the final MDR.
- MDR Index / content will be confirmed with Client before making.
- Construction drawings will be made an as-built for reviewing and approval.
- All outstanding work list should close out or update in the master list for further actions.
- Guide to make a sample MDR.
Storage and submission
- Retention of document shall follow your quality system, such 3 years or 5 years.
- Document submit eight hard copy or soft copy or both to your client.
- Do not submit via email with many files attached in the email, it should combine into a “.ZIP” folder, not compressed “.RAR” file.
- Submission should use a secured platform such Google One, SharePoint, WeTransfer.
ASME Interpretation - xem các giải thích từ ASME
Link hướng dẫn bạn kiểm tra các giải thích từ Quy chuẩn/ yêu cầu của ASME.
--> https://cstools.asme.org/Interpretation/SearchInterpretation.cfm.
Đa số anh em tìm kiếm các giải thích cho các Quy chuẩn như ASME IX, ASME VIII ,...
Ví dụ, bạn cần hiểu về QW-200.4 trong ASME IX thì tìm đúng code và mở giải thich để in file pdf:
___Chọn Quy chuẩn tại ["Standard Designation": BPV Section IX"] > "Search" để chọn tất cả > "Ctrl + F" để tìm các giải thích phù hợp > xem kết quả QW-200.4 - Material Combination.
Còn rất nhiều các giải thích khác, bạn tự tìm nhé! Kể cả ASME B31.1/31.3, ...
Featured Post
Giám sát hàn
(Hình ảnh chụp tại nhà máy CNI - Nhơn Trạch) I. NÊN HỌC CSWIP KHÔNG? BẮT ĐẦU TỪ ĐÂU? Khi bắt đầu tìm hiểu về chứng chỉ CSWIP (Certification ...
Popular Posts
-
(Hình ảnh chụp tại nhà máy CNI - Nhơn Trạch) I. NÊN HỌC CSWIP KHÔNG? BẮT ĐẦU TỪ ĐÂU? Khi bắt đầu tìm hiểu về chứng chỉ CSWIP (Certification ...
-
QUAN TRỌNG !!! 1. Tất cả thành viên tham gia phải đúng tên và đầy đủ tên thật khi tham gia nhóm. 2. Thành viên vị phạm sẽ bị loại mà không t...
-
WB-001 - EN 1090 & ISO 3834 - Code Books BS EN 1090-1 - 2009+A1-2011 BS EN 1090-2 2018 ISO 3834-1-2021 ISO 3834-2-2021 ISO 38...
-
[1] Heat Input - Welding process denoted number 111, 121, 126, … according to BS EN ISO 4063:2010 shall be applied k-factor (EN 1011-1). AW...
-
🔧 1. Joint Detail and Fit-Up Tolerances in WPS 🔹 Clause 5.21.4.1 – Fit-Up Tolerance Requirements Fit-up tolerances for groove weld assembl...
-
ISO 9606-1 là tiêu chuẩn quốc tế quy định các yêu cầu kiểm tra và chứng nhận năng lực thợ hàn kim loại theo phương pháp hàn hồ quang (ar...