ASM Handbook Set



ASM Handbook Set (33 Volumes + Index) 

  

Volume 1: Properties and Selection: Irons, Steels, and High-Performance Alloys 

Volume 2: Properties and Selection: Nonferrous Alloys and Special-Purpose Materials 

Volume 3: Alloy Phase Diagrams 

Volume 4: Heat Treating 

Volume 4A: Steel Heat Treating Fundamentals and Processes 

Volume 4B: Heat Treating Technologies (shipping October 2014) 

Volume 4C: Induction Heating and Heat Treating 

Volume 4D: Heat Treating Irons & Steels (shipping October 2014) 

Volume 5: Surface Engineering 

Volume 5A: Thermal Spray Technology 

Volume 6: Welding, Brazing and Soldering 

Volume 6A: Welding Fundamentals and Processes 

Volume 7: Powder Metal Technologies and Applications 

Volume 8: Mechanical Testing and Evaluation 

Volume 9: Metallography and Microstructures 

Volume 10: Materials Characterization 

Volume 11: Failure Analysis and Prevention 

Volume 12: Fractography 

Volume 13A: Corrosion: Fundamentals, Testing, and Protection 

Volume 13B: Corrosion: Materials 

Volume 13C: Corrosion: Environments and Industries 

Volume 14A: Metalworking: Bulk Forming 

Volume 14B: Metalworking: Sheet Forming 

Volume 15: Casting 

Volume 16: Machining 

Volume 17: Nondestructive Evaluation and Quality Control 

Volume 18: Friction, Lubrication, and Wear Technology 

Volume 19: Fatigue and Fracture 

Volume 20: Materials Selection and Design 

Volume 21: Composites 

Volume 22A: Fundamentals of Modeling for Metals Processing 

Volume 22B: Metals Process Simulation 

Volume 23: Materials for Medical Devices 

Comprehensive Index to ASM Handbooks, Third Edition 

 

Format: Hardbound, 33 Volume Set + Index 

 

Publisher: ASM International 

Published: 2014


Order at https://www.asminternational.org/books-handbooks/ 

Skid fabrication - inspection documents for QC

Following the topic, we would like to share you the quality document for small skid.


Inspection check list

  • Procedures and inspection should prepare and included in your hand, NDE procedure, NDE map, welding map and NDE plan also prepared.
  • You should make a content of procedures for control, type of inspection report, below is sample list of procedure.

Document control

  • Too many drawings/ document per each skid, so it should carefully update with latest revision,
  • Line list should be updated and control the piping spool number, all spools to be identified in the test package later.
  • Shop drawing, document submission to be documented revision number, date of submission, date of return, and approval code, etc.

 Inspection report

  • To control and monitor all inspection reports, the assigned coding number should generate before starting issue.

 Welding summary

  • For structural steel
  • For piping

 Material receiving inspection

  • MRIR for piping, bolting, gasket, fitting
  • MRIR for consumable
  • MRIR for structural steel
  • MRIR for electric & instrument
  • Material traceability

 Visual inspection

  • For piping
  • For structure

Dimensional inspection

  • Base frame - structure.
  • Piping spool, loose items.
  • Tie-in point report.

 NDE Reports

  • MT/PT reports
  • RT/UT reports
  • Hardness test, ferrite test (if any)

Coating inspection report

  • Blasting and painting inspection report
  • Pickling and passivation report
  • Holiday test, salt test, dust test, pull of test (if any)

 Testing reportHydrotest & Pneumatic test

  • See hydrotest & pneumatic test procedure, prepare the test package, and update the test package.

 Factory acceptance test

  • Tie-in point report.
  • Bolt tightening report.
  • Leak test for instrument air.
  • Leak test for pipe system.
  • Function test for valve, equipment.

 Packing report

  • Important do not miss during inspection: to check all the packing list, listed out all items installed or mounting on skids, spare part items, loose items, location of packing items, protection, preservation, etc.
  • Record all packing and photos evident should be kept.
  • To make sure all package had been checked and verified by all parties, and signed off in the packing list before moving next stage of the issue "IRN - Inspection Release Note".

 Inspection release note

  • The IRN will be issued by Client or their representative inspector will issue it because the inspection point is Hold Point.
  • This is an evident document for payment and confirmation that had been inspection before shipping. 

Final Manufacturer data book

  • Collect all procedure, instruction used for fabrication and inspection record to the final MDR.
  • MDR Index / content will be confirmed with Client before making.
  • Construction drawings will be made an as-built for reviewing and approval.
  • All outstanding work list should close out or update in the master list for further actions.
  • Guide to make a sample MDR.

 Storage and submission

  • Retention of document shall follow your quality system, such 3 years or 5 years.
  • Document submit eight hard copy or soft copy or both to your client.
  • Do not submit via email with many files attached in the email, it should combine into a “.ZIP” folder, not compressed “.RAR” file.
  • Submission should use a secured platform such Google One, SharePoint, WeTransfer.

ASME Interpretation - xem các giải thích từ ASME


Link hướng dẫn bạn kiểm tra các giải thích từ Quy chuẩn/ yêu cầu của ASME.
--> https://cstools.asme.org/Interpretation/SearchInterpretation.cfm.
Đa số anh em tìm kiếm các giải thích cho các Quy chuẩn như ASME IX, ASME VIII ,...
Ví dụ, bạn cần hiểu về QW-200.4 trong ASME IX thì tìm đúng code và mở giải thich để in file pdf:
___Chọn Quy chuẩn tại ["Standard Designation": BPV Section IX"] > "Search" để chọn tất cả > "Ctrl + F" để tìm các giải thích phù hợp > xem kết quả QW-200.4 - Material Combination.
Còn rất nhiều các giải thích khác, bạn tự tìm nhé! Kể cả ASME B31.1/31.3, ...

Setting parameters for MIG / MAG processes

 

(IWE 1.08-1 - Figure 29: Welding voltage and welding current for different shielding gases)

Above photo is an example to determine welding parameter with variant shielding gas.

Example 1: 145A, 22V, 100% CO2

Example 2: 190A, 24V, 100% CO2

Example 1: 250A, 28V, 100% CO2

You are so referred to other shielding gas and variant welding parameter in IWE handbook -Module 1.08-1:2018 edition.

A golden weld


Welder assigned for this joint is a very important criteria. He have to be highly skilled as the NDT requirements for this joint is normally higher than that of other joints.


My experience, the golden joints are subjected to RT, UT, MPI & hardness test. It depends on the standard being followed and the client requirements.


Golden weld joint is that joint in which the new piping is connected to the existing piping. Hence this joint cannot be hydrostatically tested. So it has to be ensured that it should be defect free as per the standard (eg: ASME B31.3 Section 345.2.3).



Heat input calculation



Definitions, EN 1011-1 or CEN/TR 1459

Heat input, energy introduced into the weld region during welding per unit length, also see AWS A3.0

Heat input. The energy applied to the workpiece during welding.

Heat input rate. The heat input per unit length of weld.

The heat input during welding can be viewed as a main influencing factor on the
properties of ferritic and ferritic-austenitic stainless steel welds in particular. This
influences the time/temperature cycle occurring during welding.


EN 1011-1 2009, Section 8.7
Thermal efficiency factor k are in accordance with Table 1 of EN 1011-1 : 2009.


ASME IX 2017
What is the difference between arc energy and heat input?
Arc energy is the energy supplied by the welding arc to the workpiece before the efficiency of the process is considered.


BS EN ISO 15614-1 : 2017
Welding qualification for all positions, see Section 8.4.2 and topic , Welding position requirement in BS EN ISO 15614-1.
Heat input determination and range of qualification, see Section 8.4.7.


ASME Section IX 2019
QW-405.2 positions, vertical position qualification were deleted in latest revision for welding process SMAW, GTAW, FCAW/FCAW and PAW.
Heat input determination and range of qualification, see QW-409.1


Interpretation
ASME IX: Heat Input Variables, recorded no. BPV IX-19-16 36.


Download free at https://meta.duybien.com/t/149 

ASTM A516M Gr. 485 là gì?




ASTM A516M Gr. 485 là gì?

--> Gr. 485 tương đương với Gr. 70.

Có hai đơn vị tính là US và SI
__Hệ US: ASTM A516 Gr. 70
__Hệ SI: ASTM A516M Gr. 485

Featured Post

Giám sát hàn

(Hình ảnh chụp tại nhà máy CNI - Nhơn Trạch) I. NÊN HỌC CSWIP KHÔNG? BẮT ĐẦU TỪ ĐÂU? Khi bắt đầu tìm hiểu về chứng chỉ CSWIP (Certification ...

Popular Posts